Tuesday, April 21, 2009

Concrete pumping

Today another milestone - the concrete slab is poured. It was a bit rainy today but this didn't stop the action and the concrete pump and first concrete truck arrived 7.30 in the morning. In total 8 trucks with concrete. The slab is relatively thin - only 6 cm thick. Without the underfloor heating the slab would have been only 4 cm thick.
In the afternoon the concrete was smoothed (screeting?) and it looks pretty good. Unfortunately the contractor clipped 3 of pipes from the underfloor heating system with the screeting machine. Luckily the damage is done above the concrete and should be easy repairable. A bit of a scare.