Saturday, June 27, 2009

roof panels arrive

Another milestone this week with the arrival of the roof panels. The roof panels are of a "sandwich" construction. The outside steel layer, insulation layer and inner ceiling all in a single package. The total thickness is approximate 15 centimeter. The insulation material is polystyreen. Not that "natural" but sometimes a few concessions are necessary. The panels are tailor made and 11 meter or 4.5 meter. It was a bit of a challenge for the truck driver to get his unit down the driveway. Lifting the panels of the truck also required a special framework to make sure the panels didn't brake up in mid-air.

The builders also progressed with placement of the rafters and the framework for the deck. The macrocarpa beams are starting to smell nice too.


Sunday, June 21, 2009

ridgebeam



ridgebeam
Originally uploaded by Strawbale house Carterton
Friday, we reached the highest point with the building. A big crane was hired to lift and place the steel beam spanning the lounge area. The macrocarpa beams for the other parts were also lifted in place. The macrocarpa stud in the kitchen was also placed.


Tuesday, June 9, 2009

A nice winter day

This week some steady progress. The weather has been kind to us and the builders and as a result the framing has gone up for the second floor. It is starting to feel like a house and we are getting a feel for the dimensions. Fingers crossed the weather keeps up and the builders can start with the apex. The ridge beams (see last weeks update) are ready and we are looking forward having them on site.


Sunday, May 31, 2009

Macrocarpa beams

Yesterday was an exciting day as we went to see our macrocarpa timber beams being sawn. It is one of our objectives to source as much as possible materials locally and it is pretty cool to have a sawmill 500 metres "down the road" (Ticehurst).
The macrocarpa beams are used for the apex and other parts of the roof structure. The same timber is also used for external posts for the verandah/deck. The macrocarpa will not require chemical treatment and the finish will be natural oils.


Friday, May 29, 2009

More framing

We are back in business. After last week's storm the builders made some good progress. The blog is less frequently updated because it is getting wintery and now arriving home from work in the dark. No good for taking pictures. Anyway, internal framing completed and the loft is in. Quite nice to have a look around from the second floor although it will be a different look and feel after the roof goes on.


Sunday, May 17, 2009

Framing internal walls goes up

It has been a bit quite during the last couple of weeks - mainly due the weather and now we are in a bit of a pickle too. Also due to the weather.
The last two weeks the weather was very unreliable with most of the days either rainy or forecasted rain. This caused more than a week of delays as the builder couldn't finish the sealing of the concrete (where the walls will be placed).
This week we saw some good progress with the internal wall framing going up (bathroom, laundry etc.). The builder started also with building the scaffold to support the placement of the ridge beam - a 10 m piece of steel.
Unfortunately, the bad weather continued and it went from windy to storm last week. The scaffold was not prepared for that and decided to take a walk across the concrete floor last night. In doing so it took the bracing of the internal walls with it. What looked as great progress on Friday afternoon looked suddenly very sad on Sunday morning. Luckily the builder responded quick and saved the internal walls from further damage. It can all be fixed easily and the damage is limited. The scaffold needs to be rebuild though. At the end we are lucky that the steel ridge beam was not sitting on the scaffold.


Sunday, April 26, 2009

Concrete floor

All the concrete has been poured this week and it looks all very smooth. The boxing is removed and the builders will start with the framing the coming week. People that have seen it are all very impressed with the round corners and the smoothness of the concrete. Today it was sunny weather and nice to be able to walk bare feet on the concrete.