Friday, we reached the highest point with the building. A big crane was hired to lift and place the steel beam spanning the lounge area. The macrocarpa beams for the other parts were also lifted in place. The macrocarpa stud in the kitchen was also placed.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment